Dispatch of Indirect Water Bath Heater for PPL

We have finalized and dispatched the awarded project for Indirect Water Bath Heater for PPL (Pakistan Petroleum Limited)


The Process skid unit has been equipped with Indirect Water Bath Heater, Dual Fuel (Fuel Gas and Diesel) Burner System, Water and Diesel Pumps, Diesel tank, Piping, Supports and related Instrumentation and Control System, employing NOVARGI Technology for Process Equipment and Modularization.
We have also performed at our workshop the FAT with positive result and with the presence of the Third Party Inspection (Bureau Veritas). Please find below some of the pictures and also a video with details of the FAT test.

 

PPL Fabrication Aceptance Test
PPL Fabrication Aceptance Test

Versions of a sialis happen different but the most popular at the moment it cialis free trial still it call free cialis because it is in a free access.